Settings and activity
4 results found
-
48 votes
Matt Knotts supported this idea ·
An error occurred while saving the comment -
1 vote
Matt Knotts shared this idea ·
-
5 votes
Matt Knotts supported this idea ·
-
14 votes
An error occurred while saving the comment Matt Knotts commented
This is critical and would save so much time. Being able to select and copy multiple clips simultaneously is necessary
Matt Knotts supported this idea ·
This has been a pain point in my workflow for a long time. I run a primary/backup setup with both machines connected to a shared network drive. When I make changes on the primary, I save the project and load it onto the backup. The problem is that interaction settings, OSC IPs, ports, server configs, are stored in the project file. So every time I load an updated project onto the backup, all of those settings get overwritten with the primary’s values, and I have to manually reconfigure them.
What I’d love to see is the ability to designate a machine as a backup that syncs the project content (boards, timelines, media references, effects, transitions) while preserving its own local interaction and device settings. That way when I make a change on the primary, the backup picks it up automatically without me having to re-enter all the OSC configuration every time. It would save a huge amount of time, especially during rehearsals when changes are constant